As several of our clients already know, last year we started working on plans for our condo atop of a 2 1/2 car garage that would house our tools as well as cars. We have jumped through several hoops like getting the plans approved by the Township and working with a local architect to avoid having to get a variance - long and expensive process. We are now at the point where we can move forward with the actual concrete and lumber. It's always exciting to see the lines on a drawing become the walls of a structure.
The picture to the right shows the outline of the addition. It always looks smaller then it actually is for some reason. The condo upstairs will be 1000 + square foot.
As you can see below, the footings have been started. And the Dumpster has arrived - hooray.
While the framing and other task will be done by us and other family members who are in the construction business, a local Concrete Contractor and HVAC Contractor are in place. I am working on hiring a Roofing Contractor.
A rough draft of the finished condo is below. I am still designing the space but I have some of the products already picked out. I've time since we won't actually get to this for a few months yet. The interior is my realm, so I can not wait.
As we proceed, I will keep you posted.